| MOQ: | 10 |
| Harga: | To be quoted based on specifications |
| Periode pengiriman: | 5–8 hari kerja |
| Metode pembayaran: | L/C,D/A,D/P,T/T |
| MOQ: | 10 |
| Harga: | To be quoted based on specifications |
| Periode pengiriman: | 5–8 hari kerja |
| Metode pembayaran: | L/C,D/A,D/P,T/T |